Aplitop - Solutions - Civil Engineering

aplitop-spinning
Our experience, your best work tool.

Civil Engineering

Innovation

Our technological base makes us attach great importance to I + D + i with direct application to the Topography sector.

Do we cooperate?

Solutions that facilitate the development of road projects, railways, tunnels, dams, power lines, pipes and all types of civil works.

Civil Engineering

    Design and Planning

    • Preliminary projects of linear works
    • Analysis of affected services
    • Environmental impact analysis

    Terrain Modeling

    • Digital elevation models
    • Long and cross sections
    • Calculation of cut and fill volumes

    Control and Monitoring of Works

    • Surveys of the current state of the work
    • Staking out and topographic control
    • Control of tunnel works with total station or laser scanner
    • Measurement and analysis of deformations
    • Certifications, reports, and quantity take-off

    Application Integration

    • LIDAR, scanner or photogrammetry point cloud management
    • Import and export of the main market standards
    • OpenBIM workflows
Civil Engineering

We can help you

If you have any specific questions about your needs, or if you already have it clear and want to buy the application, do not hesitate. Contact us and we will be happy to assist you.

Related products

TcpGPS for Android
TcpGPS for Android

All-in-one solution for surveying and setting-out with GNSS receivers

TcpScancyr
TcpScancyr

Analysis of tunnel data captured by terrestrial scanner

TcpMDT Professional
TcpMDT Professional

All-in-one solution for Surveying and Civil Engineering projects

Tcp PointCloud Editor
Tcp PointCloud Editor

Point cloud management software for surveying projects

Success Stories

Expansion of the North Tarrant Express Highway
Expansion of the North Tarrant Express Highway

The North Tarrant Express extension (segment 3C) in Texas will extend along 6.7 miles from Heritage Trace Parkway, north of US 81/287 to Eagle Parkway, in Denton County. Existing lanes will be upgraded and will continue to be toll-free, while two tolled managed lanes each way will be built, as well as on-ramps.

Extension of the Pūhoi Highway
Extension of the Pūhoi Highway

The project will extend the Northern Motorway (SH1) with a length of 18.5 km from the Johnstones Hill Tunnels to just north of Warkworth. It is the first stage of the Ara Tūhono (connecting pathway) project from Pūhoi to Wellsford.
The new safer, more resilient route is now expected to be opened to motorists in May 2022.

Rehabilitation of the Ulriken Tunnel
Rehabilitation of the Ulriken Tunnel

Azvi has signed the contract with Bane NOR (Norwegian public railway infrastructure manager) to carry out the rehabilitation of the old Ulriken railway tunnel in Bergen, within a period of 29 months. This tunnel was built in the 1960s and runs parallel to the new Ulriken tunnel.

Development of Line 3 of the Riyadh Metro
Development of Line 3 of the Riyadh Metro

ArRiyadh New Mobility Consortium (ANM) was selected to deliver the 41.8Km Line 3 of the Riyadh Metro which will form part of the six-line mega project that will run for a total length of 176Km across the city. ANM is led by Italian construction group Salini Impregilo and includes partners Larsen&Toubro (India), Nesma (Saudi Arabia), Ansaldo STS (Italy), Bombardier (Canada), Idom (Spain) and WorleyParsons (Australia).
The new Line 3 is the longest section of the gigantic project of the new metro network of the capital city of the Kingdom of Saudi Arabia.

Can we help you?